HISTORY OF THE COMPANY
1950
Starting its activity manufacturing probes under Felix Mateo trade mark.
1952
First total radiation Thermometer.
1954
We started the manufacturing of moving coil galvanometers.
1956
First Galvanometric controller with photoelectric setpoint detection.
1959
First temperature Chart Recorder.
1961
We introduced the Time Proportioning Control (simulation of PID algorithm).
1963
DIN and ANSI standards were introduced.
1971
First electronic controller using operational amplifiers.
1975
First galvanometric instrument with signal amplifier.
1977
First LCD hand-held indicator.
1978
First controller with digital indication (more than 30.000 units sold).
1979
First controller programmer with 4 segments (using uP 6800).
1980
Start assembling potenciometric chart recorders.
1983
Conversion to incorporated Company.
1984
Primer Sistema de Control de Processos a microprocessador (uP 6809)
1985
First data acquisition and control system (based on uP 6809).
1986
First SCADA supervisory software running under D.O.S.
1988
Introducing Head mounting 2-wires transmitters for T/C and RTD.
1990
µP based P-900 series controller with PID and communication.
1992
P-900 series is completed with advanced control functions
1994
New controller, P-800 Series in SMD with PID selftuning.
1995
Started the process for ISO-9001 certification.
1996
DAS-8000 new modular data acquisition and control system.
New SCADA supervisory software running under Windows.
1997
New configurable head mounting 2-Wire transmitter for T.C. and RTD. Configurable DIN rail 2-Wire transmitter with 1500V Isolation. Standard models CE Marked.
ISO-9001 Certification by TÜV
1998
New range of RH transmitters in SMD for industrial applications. New Function Blocks configurable instruments. New process control instruments with , Autotuning, Advanced PID and Fuzzy-Logic.
1999
Distribuited control system with communication. New SCADA in client/server architecher.
2000
New Smart instruments, HS-7000 series, for advanced Process Control.
2001
FIELDBUS communication FCS control system. New SCADA client/server architecture
2002
High range cotrollers series enlargement with MS-5000 family
2003
New Adquisition and Control modules MAC-3500 with function Blocks and comunication.
2004
FMC controllers series creation in IP-65 box for his field installation.
2005
New range Level and Conductivity probes for Boiler“s Control
2006
We introduce a new Multivariable Field Controllers Series with special functions for specific applications.
2007
We are designed a New Modbus and 4-20 mA Field Transmitters Series
2008
New 868 MHz (915 MHz in USA) Radio Transmitters Series for field mounting

Seguimos Investigando y Produciendo Productos con Alta Tecnologķa